Report on iteration Mar 29, 2021 — Apr 9, 2021 (includes all issues completed before Apr 12, 2021).

The development points for this iteration were quite low (only 4 points), but our rolling velocity continues to be unnusually high (26 points) based on the last two iterations, which were included an enormous amount of work.

Based on the design velocidy graph, we might be finding a new rhythm with design work on our new adjusted design schedule.

CDH Website

We finally finished and deployed the 3.0 release, migrating content from the outdated and unsupported Mezzanine to Wagtail. This iteration included a few issues to close out the release, deploying the update and running the exodus script to convert content, and then some bugfixes and clean up work for a planned 3.0.1 release.

Princeton Geniza Project

This iteration we finished some smaller work related to the database and admin sorting, and made progress on document detail designs. Multiple larger features were delivered late in the iteration, which didn’t give enough time for testing to be completed.

Low points this iteration may in part be a result of successful acceptance testing last iteration, which meant we had no in-progress work at the start of the iteration, as we’ve had in the past. Rolling velocity will smooth out the volatility here, as intended.

Shakespeare and Company

We had a small release for S&co with one bug fix (tested last iteration) and an enhancement adapted from PPA, to support embedding dynamic content (such as the map below) in Analysis essays and other site content pages.

Demos

Screenshot of the dynamic map embedded in the newly published essay on the Literary Right Bank on Shakespeare and Company Project

Screenshot of the dynamic map embedded in the newly published essay on the Literary Right Bank on Shakespeare and Company Project


Active projects

Releases

Velocity

Development

4 points, 10 issues. Rolling velocity: 26.67

Design

5 points, 2 issues. Rolling velocity: 3